National Retail Launch
A retail client needed synchronized deliveries to 43 stores over 10 days. Veridock built a staged cross-dock plan with time-window controls.
- 21% increase in launch-window success rate
- 34% drop in missed-store appointments
- Single escalation desk for all routes